BikeCompanion
Get the app

Bukit Sipudang from Karangtengah: what you need to know

Everything about cycling up Bukit Sipudang from Karangtengah

Bukit Sipudang is a climb of 24.5 kilometers (hors catégorie). The climb finishes at 1,659 m above sea level. It is located in Karangtengah, Jawa Tengah, Indonesia. The average gradient is 6.1% with a maximum of 21.7%. The climb has 1491 meters of elevation gain.

Elevation profile

Elevation profile

Climb statistics

Hors catégorie
Difficulty score: 2174 (Very hard)
Finish altitude
1,659 m
Distance
24.5 km
Avg. gradient
6.1 %
Max gradient
21.7 %
Elevation gain
1491 m
Steepest section: 21.7% (km 19.8)
Tips

Difficulty breakdown: With 24.5 km for 1491 m of elevation gain and an average gradient of 6.1%, Bukit Sipudang from Tinembang is a serious beyond-category climb. The first half is mostly moderate, with gradients largely between 2% and 5%, which lets you settle into a steady rhythm. The real difficulty is concentrated in the last section, from km 18.0 to km 24.5, with gradients of 8%, 16%, 11%, 15%, 9% and 11%, before a final 19% ramp over the last 500 meters.

Pacing tips:

1. Save your legs from the start Ride at a steady cadence over the first few kilometers, between 2% and 5% from km 0.0 to km 13.0, so you reach the steepest sections fresh.

2. Prepare for the km 14.0 to km 16.0 stretch With 6% gradients on this section, find the right gear before the -1% descent from km 16.0 to km 17.0, which gives you a chance to recover a little.

3. Manage the final stretch from km 18.0 to km 24.5 Drop into your easiest gear from km 18.0, keep a smooth cadence and set yourself a target for each kilometer to hold on until the final 19% ramp.

About the climbs to this summit

Reviews mostly talk about the view from the lookout: you can spot Mount Prau and the city lights when the sky is clear. But the mist comes in often, and several riders went over the pass without seeing a thing. One rider did it at night in a thick fog, and another got caught in the rain on a Friday evening.

The climb is described as steep, with tanjakan (uphill sections) and turunan (descents) that demand your full attention. One rider counts three brutal ramps before you reach the rest area. The road is patchy in places, with potholes, and some find it decent, concrete and all, while others complain about the holes. Everyone stresses the state of your vehicle: check your brakes before you set off. A rescue team is on hand 24 hours a day to help road users. One rider advises small cars not to attempt the pass.

At the top, the stop is basic. A small stall serves coffee, tea, ginger, snacks and noodles, usually for around 3,000 rupiah. There are toilets, a small car park, a little flower garden and decent wifi, though the mobile signal is patchy. A karaoke machine costs 10,000 rupiah per hour. Some find the spot pleasant for catching your breath before or after the climbs. Others say the main building is dirty and its renovation isn't finished, which leaves it feeling a bit abandoned.

It's cold up there, so bring something warm to wear. The pass can be tackled from Batang via Bawang, or in the other direction towards Dieng. Some riders describe it as a stage that delivers serious thrills, especially when the road is wet or covered in mist.

Estimated times

24.5 km • 1491 m D+

Leisure 4h 55min
5.0 km/h 350 m/h
Regular 3h 05min
8.0 km/h 550 m/h
Trained 2h 10min
11.3 km/h 800 m/h
Climber 1h 35min
15.5 km/h 1100 m/h
Pro 1h 05min
22.6 km/h 1600 m/h

VAM: average climbing speed, based on elevation gain

Get the app

BikeCompanion App Screenshot BikeCompanion App Screenshot

Join thousands of cycling fans! Plan your rides, record your performance, track your progress and discover the finest climbs.
Live climb profile to pace your effort all the way to the top.

Climbs nearby

Within 20 km